Converting Boiler From LP To Natural Gas:
1.
Follow instructions To TURN OFF GAS TO APPLIANCE
found on Operating Instructions label on boiler or in
Installation, Operation & Maintenance Manual. Verify all
electrical power to boiler is turned off.
WARNING
Electrical shock hazard. Turn OFF electrical power
supply at service panel.
!
2.
Remove upper jacket from boiler.
3.
Follow instruction TO TURN OFF GAS TO APPLIANCE.
Verify electrical power is OFF.
4.
Remove screws as shown in gures 1 & 2. Carefully
separate gas valve.
5.
Remove ori ce as shown in gures 1 & 2.
6.
050 Mbh thru 200, O-ring gasket shown in gure 1
must remain in place.
7.
Connect gas valve using previously removed screws.
8.
Place "LP to Natural" and "Converted by" labels onto
boiler as shown in gures 4 & 5.
9.
Replace upper jacket.
10.
Follow instructions in “Start-up Procedure” section of
boiler's Installation, Operation & Maintenance Manual
for proper startup and veri cation procedures.
Figure - 3 Brass LP Ori ce
Figure - 2 Disconnect Venturi Body from Gas Valve,
299
Table 1 - LP Ori ce
Propane Ori ce Chart
Model
Part No. Size
050 240008864 3.8mm
075 1350018 3.9mm
100 240008263 4.6mm
150 240008865 5.4mm
200 240008866 5.9mm
299 240009904 9.6mm
Brass LP Ori ce
Gas Valve
Screws
WARNING
Fire, explosion, asphyxiation and electrical shock
hazard. Improper installation could result in death or
serious injury. Read this instruction and understand
all requirements, including requirements of authority
having jurisdiction, before beginning installation.
Installation not complete until appliance operation
veri ed per Installation, Operation & Maintenance
Manual provided with boiler.
!
Kit installation shall be completed by quali ed agency.